top of page
Anchor 1
WAHA

OUR CLIENTS and PROJECTS

WAHA Oil Company

  • Spare Parts – Vehicles (Tender already submitted) - 2017

  • General Maintenance at Gialo 59 Field - 2013

  • Technical / In-Country Engineering Services (Engineering, Technical, Consultancy, and General Maintenance Services)

  • 2008 to Present

  • Gas Plant Pipeline and Equipment Integrity Assessment - 2009

ZUEITINA Oil Company

  • Technical Assistance - 2007  to present

  • General Maintenance Services - 2010 to 2011

  • Replacement – Fire Water Main System (Zella Field) - 2008 to 2010

  • Replacement - Fire Water Main System (Sabah Field) - 2008 to 2010

​

​

 

 

BREGA Petroleum Marketing Company

  • Supply & Construction – New Floating Storage-30,000 m3 Oil/Gas T-104C (In Progress - Misurata Terminal) - 2017

  • Maintenance – Six(6) Units LPG Spherical Tanks – T71,72,73,74,75/76(Tripoli, Terminal) - 2016

  • Pre-Engineering Studies – Installation of Single Point Mooring (SPM) (Janzur’s Depot) - 2016

  • Installation – New 14” Pipeline Petroleum Products –Refinery to Terminal (Zawia) - 2016

  • Provision/Prepare Drawings  using 3D Scanning & Modeling -Bldgs, Tanks, Pipes &Const’n Facilities (Terminals (Tripoli, Janzour, Sabha) - 2015

  • Tender No. ZA(T 503) HTC15 Completing the Construction of Fuel Tank No. 503 (Zawia) - 2015

  • Construction -Petroleum Trucks Unloading Station (Benghazi, Libya) - 2014

  • Replacement – Floating Roof Tanks Seal T4-568 & 569 (Sarir P.P. Depot) - 2011

  • Pipeline Study – Ras El-Mungar Terminal (Benghazi, Libya) - 2011

  • Replacement – Floating Roof Tanks Seal T-567 (Sarir P.P. Depot) 2010

 

​

​

MABRUK Oil Operations Company

  • Dislodging and Cleaning of 13 tanks  - ( Offshore ) 2017 

  • Shutdown Activities  - ( Offshore ) - 2017 

  • Platform & Farwah FPSO Painting Repair of 6 Crude Oil Tanks (Al-Jurf Field - Offshore) - 2016 

  • Engineering Heli Lounge and Coast Guard Office Modification in FPSO (Farwah - Offshore) 2016

  • Fixing the 30” Pipe Conductor Movement of Wells B-03, B-10 & BD-01 (Al-Jurf Field - Offshore) - 2016

  • CFT-LOG-376-2016-PIP Logistic at Tripoli Marine Based (Al-Jurf Field - Offshore) - 2016

  • Fabrication, Supply and Installation of FM200 Cabinet at BD-1 (Al-Jurf Field - Offshore) - 2016

  • Cleaning  Works of COT’s 3S @ FPSO (Al-Jurf Field - Offshore) - 2016

  • Cleaning of Two COT’s Prior Class inspection (Al-Jurf Field - Offshore) - 2015

  • Cleaning of 4 Units COT’s FPSO (Farwah - Offshore) - 2015

  • Farwah COT’s Bottom Paint Repair Campaign (Al-Jurf Field - Offshore) - 2014

  • Inspection $ FFS for heat exchanger 301-E05/Construction and Repair - (Mabruk Field) - 2009

  • Visual Inspection and Ultrasonic Testing (UT) Wall Thickness Inspection At BD1 Platform & Farwah FPSO (Al-Jurf Field - Offshore) - 2009

MELLITAH Oil & Gas (BV)

  • General Maintenance Services at El-Feel Field (El-Feel Field) On-Going - 2017

  • EPCC – New Mobile Produced Water Treatment Plant (El-Feel Field) - 2017

  • New Incinerator System - Complete Renewal (El-Feel Field) - 2017

  • MCC/TCC  Sewage Treatment Plant Refurbishment (El-Feel Field) - 2017

  • Airport Runway, Taxiway & Apron Repairing (El-Feel Field) - 2017 

  • 24Core Fiber Optic Cable Cut Re -Instatement (El-Feel Field) - 2017

  • 30” Pipeline Crude Oil Coating Removal and Re-Coating Application - 2017

  • Cold Sea Water & Sewage Piping Network Revamping in DP3 & DP4 Platforms (Bouri Field - Offshore) - 2016

  • Provision of Manpower and Facilities (Mellitah Complex) - 2016

  • Provision of Technical Assistance (Tripoli, Mellitah) - 2016

​

Akakus Company

  • Replacement of Zawia Tank Farm Fire Fighting Foam System for 9 Tanks (NC-115-03-2018) - 2019

​

Sirte Oil Company

  • Technical Assistance - 2016 to Present

​

Dietsman Maintaining Energy

  • Installation of By Pass Line and Installation of Pipeline Receiver & Launcher (Wafa Oil Field) - 2013

 

Nabors Drilling International LTD

  • Nabors Drilling International Limited Technical Assistance - 2007 to 2009

ZOC
BREGA
MABRUK
MOG
DIET NABOR
bottom of page